CAN DO Building No. 2

CAN DO exterior

Project Name

CAN DO Office Building

Location

Hazleton, PA

Project Description

A unique project built to support a sophisticated infrastructure and conform to strict environmentally friendly LEED specifications, construction of the new CAN DO office building has demonstrated Quandel’s versatility.

Throughout the construction process, many steps were taken to achieve rigid LEED recognition, such as:

• Using windows with inert gasses between panes to reduce inside-outside heat transfer
• Positioning the building so inside spaces receive plenty of natural light
• Landscaping with water-efficient plants and designs to eliminate the need for irrigation
• Using low-emission adhesives, CFC-free HVAC systems, carbon monoxide monitors and other technology to improve interior air quality for employees
• Using Energy-Star compliant equipment throughout the building • Purchasing materials that are produced regionally to reduce transportation costs and effects

The CAN DO office building, near the junction of Interstates 80 and 81 in northeastern Pennsylvania, was carefully constructed to accommodate 100 percent digital switching and a number of other high-tech telecommunications features and utilities.

The new 54,000 sq. ft. building offers 49,500 sq. ft. of tenant space and can be subdivided to house one to four businesses.

Square Footage

54,000 Sq. Ft.

Owner’s Name

CAN DO, Inc.

Architect

Highland Associates, Ltd.

After a rigorous selection process, Quandel was chosen from among 11 design-build firms including five Top 500 D-B firms. The selection criteria included technical, aesthetic, and cost-sensitive components. Their high rating in this phase along with the excellent recommendations received convinced us that Quandel could deliver the anticipated design. Within a nine-month timeframe and strict LEED guidelines, Quandel delivered the project on time and significantly under budget. When questions were raised throughout the construction process, we were quickly advised of the situation and kept ‘in the loop.’ The project manager was constantly on top of the subcontractors and the site superintendent helped everyone to work harmoniously from start to finish. This is truly a class-A office space. To be honest, I could not have had an easier job.
- John Ackerman, PE, Director of Operations