by Teri Salle | Oct 25, 2022
Performance Construction was hired as a subcontractor to form, pour, and place the cast in place concrete. The scope of work included a 40 foot spillway with ogee weir. To the right of the spillway is the outlet structure. On each side there are large embankments with...
by Teri Salle | Oct 25, 2022
Performance Construction Services was selected as a subcontractor to complete new concrete work, labor, layout, and equipment for the concrete construction of the right abutment structure, concrete grade control wall, right embankment structure, concrete spillway,...
by Teri Salle | Oct 25, 2022
Performance Construction Services was hired to construct a new labyrinth stepped spillway with energy dissipating blocks. The spillway was 125 LF wide, 88 LF long and contained 2,300 CYs of Class AAA concrete. The spillway contained approximately 2,300 LF of...
by Teri Salle | Oct 25, 2022
Performance Construction Company was hired to construct a new spillway, control tower bulkhead, and cast-in-place box culvert and outlet structure. The project included: Class C Concrete Backfill – Placement of approximately 460 CY of PennDOT Class C concrete...
by Teri Salle | Oct 25, 2022
The Lofty Reservoir Rehabilitation Project originally consisted of the removal of a portion of the top of the dam crest and installation of a concrete retaining wall for the full length of the crest to allow for a higher level of safety curing a probable maximum flood...