Employee Login
2601 Market Place, Suite 200, Harrisburg, PA 17110   |   CALL US: 717.657.0909
Our Projects

New Wastewater Treatment Plant & CHP System

Adams County-based Knouse Foods Cooperative, Inc. has selected Quandel to provide construction management services for their new wastewater treatment facility at Knouse Foods’ Peach Glen Plant.
Peach Glen, PA

Project Details.

The current wastewater treatment facility, at Peach Glen, will be replaced to meet future production demands, improve overall sustainability and meet DEP mandated requirements. The new facility will replace the existing spray field operations with an Anaerobic Digester with residual food waste handling followed by a membrane bioreactor for polishing of wastewater for final stream discharge. In addition to the wastewater treatment facility, a combined heat and power (CHP) system will be constructed to utilize the biogas generated by the anaerobic digester to generate electricity, hot water and steam to offset current and future facility demands.

ARCADIS U.S., Inc. has been contracted as the design-builder for this wastewater treatment project.

Knouse Foods is a fruit-grower owned agricultural cooperative that produces a variety of apple, peach and cherry products.

Project Specifications

Project Size
N/A

Owner’s Name
Knouse Foods Cooperative, Inc.

Architect
ARCADIS U.S., Inc.

Completed By
Work with Quandel

Interested in building with us? Send us a message today and let us know how we can help you.

"*" indicates required fields

Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.