This assignment consisted of construction of poured-in-place concrete tankage and a 550 square foot masonry building, installation of process equipment and electrical controls and interconnection to existing tankage and services.
The plant serves approximately 750 dwelling units and treats an average of 275,000 gallons of wastewater per day.
