Core 5 Valley West Logistics Center

Project Name

Valley West Logistics Center

Location

Perry Township, PA

Project Description

Quandel was hired by Core 5 Industrial Partners as the General Contractor for their new warehouse facility on 35 acres. Construction of the warehouse included:

  • 126 tilt-up concrete panels
  • 78 overhead loading doors
  • Fully-adhered 60 Mil EDPM roofing system
  • 106 stalls for trailer parking
  • ESFR sprinkler system with a 2,000 GPM backup diesel pump
  • LED light fixtures throughout the facility

The floor slab was completed using the Ductile Crete floor system, eliminating numerous control joints in the slab. Ductile Crete is a two-part slab installation. The tilt wall panels were cast on the first pour then the second and final slab pour was placed after the building was under roof.

Square Footage

505,000 Sq. Ft.

Owner’s Name

Core 5 Industrial Partners

Architect

Macgregor Associates Architects