


Project Name
Stadium & Track Upgrades
Location
Kutztown, PA
Project Description
Quandel was selected as the general contractor for Kutztown University’s stadium and track upgrades. The project consisted of resurfacing the existing synthetic track and the installation of a new synthetic turf football field. During the removal of the old field, Quandel installed a complex underground drainage system as well as a drainage system around the parameter of the track. As part of the upgrades, Quandel installed a new track overlay with striping and painted the press box, and installed new goal posts and a flag pole.
Owner’s Name
Kutztown University
Architect
Buchart Horn, Inc. | Basco Associates
I feel our new stadium and track facility is one of the finest in the Pennsylvania State Athletic Conference and the East region. The tie in between the stadium and the newly completed Student Recreation Center has been greatly received and provides a great venue for recreation and athletic competition.
Greg Bamberger, Athletic Director