Geisinger St. Luke’s University Health Network Orwigsburg Hospital Facility

Project Name

Orwigsburg Hospital Facility

Location

West Brunswick Township, PA

Project Description

Quandel was hired as the Construction Manager at Risk for the construction of this Acute Care Hospital in Orwigsburg, PA. The building consists of a 15,000 SF basement area which includes mechanical spaces, a laboratory, a morgue, Biomed, EVS, and the Sterile Processing Department. The first floor is approximately 48,000 SF and consists of a (14) bed Emergency Department, a Radiology Suite, an Operating Suite, Kitchen/Dining, and an Administrative Suite. The second floor is approximately 33,000 SF and was built as shell space, with the capacity to add (40) Med-Surge rooms and associated support space. The third floor is also 33,000 SF and contains (30) Med-Surg rooms along with (10) ICU/CCU rooms, as well as support space for the floor.

The building façade is a combination of brick veneer, EIFS, stone veneer, and aluminum curtain wall and punched window openings. Exterior site work included three retention ponds, paving and roadway work, new utilities, a 600 foot long segmented block wall, and a Helipad. Twin 750 kW diesel generators were installed as part of the electrical scope of work.

Square Footage

115,000 Sq. Ft.

Owner’s Name

Geisinger / St. Luke’s University Health Network

Architect

BDA Architects