The project included two separate buildings constructed on a former dump site, utilizing compaction grouting and micro-piles to accommodate the challenging sub-surface conditions. Although both buildings are single-story structures, the architectural design is very involved with multiple roof elevations, wing shaped roof structures, and an articulated façade with a combination of curtain wall, masonry, and metal panels.
The two buildings provide an educational facility with cutting edge audio-visual components and complex lab space to train students in technology programs.
Project included site development, building utility connections to municipal and other public utilities, storm water management and parking spaces, driveways, and landscaping.
