Quandel was hired by DCT Industrial as the General Contractor for their new warehouse facility on 35 acres in the Chrin Commerce Centre. The 426,000 square-foot industrial building is located at the corner of Van Buren and Hollow roads in Palmer Township. Construction of the warehouse included:
- Over 9,100 cubic yards of concrete for the 7” floor slab was poured in 11 nights
- Floor slab poured using a laser screed and exceeded flatness and levelness
tolerances of FF50 and FL35 - 172 tilt-up concrete panels
- 90 overhead loading doors
- Fully-adhered 60 Mil EDPM roofing system
- 79 stalls for trailer parking
- ESFR sprinkler system with a 2,000 GPM backup diesel pump
- A mechanical system capable of providing two air changes per hour
- State-of-the-art light fixtures throughout the facility
Construction was complete in 9 months, finishing in June 2015 with a final construction value of a little over $10 million. QEIC subsequently completed two tenant fit-outs for the building, totaling $2,775,000, which were completed in November 2015.