Performance Construction Company was hired to construct a new spillway, control tower bulkhead, and cast-in-place box culvert and outlet structure. The project included:
- Class C Concrete Backfill – Placement of approximately 460 CY of PennDOT Class C concrete backfill over excavated top of rock surfaces
- Cut-Off Wall – Installation of a one-sided, formed cut-off wall to be placed monolithically with the uppermost 15′ of spillway slabs
- Spillway Slabs, Slopped Slabs, and Stilling Basin
- Concrete Bulkhead at Control Tower
