This project consisted of a complete replacement of existing concrete spillway with embankment modifications.
Lower Frankfort County, PA

Project Details.

This project consisted of a complete replacement of existing concrete spillway with embankment modifications.​The existing spillway was 60’ wide ogee weir with sloped spillway walls. The new construction consisted of up to 36’ high battered concrete walls, 240’ of 14’ high weir walls. A total of 3700 CY of concrete was placed on this project.

Along with a 900’ long parapet wall to raise the crest of the dam, the embankment was modified with a new toe drain. Additional work included extending the conduit 75’ to allow the new embankment to be flattened to a 3:1 slope. This activity required establishing a borrow on site for the 35,000 CY earthfill placement.

As with any dam project, control of water is a major concern with DEP Dam Safety. This lake was drained prior to construction. However, inflows from rain events quickly raised the level of the basin. Being prepared and planning for these events was key to success on the project.

Project Specifications

Project Size
19750 Square Feet

Owner’s Name
Pennsylvania Department of General Services

Engineer
PA Fish and Boat Commission

Completed By
Work with Quandel

Interested in building with us? Send us a message today and let us know how we can help you.

"*" indicates required fields

Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.