Employee Login
2601 Market Place, Suite 200, Harrisburg, PA 17110   |   CALL US: 717.657.0909
Our Projects

Parking Garage

After successful completion of the first phase of Frederick Health Hospital’s improvement program, including renovations in several areas and relocating the helipad, Quandel proceeded with the construction of a new parking garage.
Frederick, MD

Project Details.

After successful completion of the first phase of Frederick Health Hospital’s improvement program, including renovations in several areas and relocating the helipad, Quandel proceeded with the construction of a new, 402-car parking garage. The new structure, built at the location of the previous helipad, connects to the existing garage at all four levels

Thirty-five caissons, ranging in diameter from 30 inches to 72 inches were drilled and installed prior to foundation construction. The improvement program included enhancements to the main entrance road, new traffic signalization, a new underground storm water management system , and three bio-retention structures, which were built as part of the storm water upgrades.

Electrical improvements included a new duct bank for the Hospital’s electrical and data services to enable construction of the new addition. Lighting within the existing garage were replaced with LED fixtures for energy efficiency, matching lighting fixtures within the new garage.

Project Specifications

Project Size
160,000 Sq. Ft.

Owner’s Name
Frederick Health Hospital

Architect
N/A

Completed By
Work with Quandel

Interested in building with us? Send us a message today and let us know how we can help you.

"*" indicates required fields

Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.