After successful completion of the first phase of Frederick Health Hospital’s improvement program, including renovations in several areas and relocating the helipad, Quandel proceeded with the construction of a new, 402-car parking garage. The new structure, built at the location of the previous helipad, connects to the existing garage at all four levels
Thirty-five caissons, ranging in diameter from 30 inches to 72 inches were drilled and installed prior to foundation construction. The improvement program included enhancements to the main entrance road, new traffic signalization, a new underground storm water management system , and three bio-retention structures, which were built as part of the storm water upgrades.
Electrical improvements included a new duct bank for the Hospital’s electrical and data services to enable construction of the new addition. Lighting within the existing garage were replaced with LED fixtures for energy efficiency, matching lighting fixtures within the new garage.