The overall scope was a total rehabilitation of the spillway & earthen embankment while maintaining water supply to the treatment plant.
Branch Township, PA

Project Details.

The new concrete spillway consisted of 3800 CY of concrete with walls up to 25’ in height. Construction of the embankment consisted of over 3000 tons of drainage sand, 2800 LF of drainage pipe, and 55,000 CY of borrow earthfill. Active 100’ deep water reservoir lowered 5’ for construction, lower normal groundwater pool 7’ below bottom of excavation, water control for overflow activations, sustained heavy rains during two back to back hurricane events.

Project Specifications

Project Size
22,867 Square Feet

Owner’s Name
Schuylkill County Municipal Authority

Engineer
Alfred Benesch & Company

Completed By
Work with Quandel

Interested in building with us? Send us a message today and let us know how we can help you.

"*" indicates required fields

Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.