Temporary flow diversion and cofferdams, excavation of embankment blankets and toe drains, reinforced concrete spillway, reinforced concrete slabs and walls, installation of anchor dowels, repointing deteriorated masonry joints at the upstream and downstream face of the dam, installing stop logs, installing drainage channels, precast concrete end walls and storm inlets.