Quandel will construct one new clarifier and rehabilitate three existing clarifiers.
In addition to the new cast-in-place concrete clarifier, the project includes removal of all equipment and furnishing with installation of all new equipment, both in the new and rehabilitated clarifiers.
The project also includes the rehabilitation of the two existing aeration tanks, conversion of the existing pump gallery into new aeration tanks, replacement of all sludge treatment equipment, and architectural modifications of the control building.
