The site work included mobilization, site grading and temporary erosion control ad drainage, underground utilities, utility tunnel, perimeter foundation and under slab drainage, architectural precast wall panels, elevators, below-grade waterproofing insulation, and drainage panels.
Project Specifications
Project Size N/A
Owner’s Name Pinnacle Health Systems
Engineer Dawood Engineers
Completed By
Work with Quandel
Interested in building with us? Send us a message today and let us know how we can help you.