This facility required a deep excavation using a slide rail shoring system to install a pre-cast concrete vault and structure. We tapped into the existing influent main sewer line, installed a series of piping, submersible pumps, backup generator, system controls & upgraded SCADA system. The overflow tank was completed by a separate prime.