Employee Login
2601 Market Place, Suite 200, Harrisburg, PA 17110   |   CALL US: 717.657.0909
Our Projects

PA American Water Pikes Creek Reservoir Dam Rehabilitation

A 40 foot spillway with an embankment over 400 foot long.....
Hunlock, PA

Project Details.

Performance Construction was hired as a subcontractor to form, pour, and place the cast in place concrete. The scope of work included a 40 foot spillway with ogee weir. To the right of the spillway is the outlet structure. On each side there are

large embankments with mass concrete. Connected to the right embankment is the over 400 foot long Grade Control wall ending with an abutment. In addition to these structures, we form and poured two abutments and wing walls for a small pedestrian bridge. This project totaled over 2000 cubic yards of concrete.

PA American Water-Pikes Creek Reservoir Dam Rehab
Project Specifications

Project Size
2225 Cubic Yards of Concrete

Owner’s Name
PA American Water

Engineer
Gannett Fleming

Completed By
Work with Quandel

Interested in building with us? Send us a message today and let us know how we can help you.

"*" indicates required fields

Hidden
Hidden
Hidden
Hidden
This field is for validation purposes and should be left unchanged.