This building directly adjacent to the airport, is 100,000 SF and consists of 12 loading docks. Construction took place near a Septa tunnel, so additional care was given for blasting. There is 54 tilt-up panels as well as an ESFR sprinkler system with a 2000 GPM diesel pump. The project also consists of 12 overhead doors with automated loading dock equipment.








