Employee Login
2601 Market Place, Suite 200, Harrisburg, PA 17110   |   CALL US: 717.657.0909

Wilkes-Barre School District New High School

Wilkes-Barre School District-New High School

Wilkes-Barre School District-New High School

Performance Construction Company was contracted by Quandel Construction to perform the concrete foundation and concrete slab work for the Wilkes-Barre High School project. The work consisted of the forming, reinforcing steel installation and the placement/finishing of...
PFNonwovens LLC-PFNonwovens Line 9 & 10

PFNonwovens LLC-PFNonwovens Line 9 & 10

Performance Construction Company was selected to complete the Foundations and Slabs by Quandel Enterprises. A 200,000 SF warehouse project that started in the winter under difficult weather conditions and was expedited using selective overtime to meet the compressed...
Johnson Controls-Development Center Project

Johnson Controls-Development Center Project

Performance Construction was hired to complete cast-in-place concrete, excavation, backfill and stone base. The work included: Cast-in-Place Concrete – Included forming, placing, finishing and curing concrete, stripping, pointing/patching and Excavation –...
Harley Davidson Motor Company-2018 Expansion

Harley Davidson Motor Company-2018 Expansion

Performance Construction was hired as the General Contractor to complete the concrete project on the Harley Davidson Motor Company’s 2018 Expansion. This project included a 45,000 square feet foundation area, slabs on grade and the construction of a tunnel....
Memorial Hospital – Site Work

Memorial Hospital – Site Work

The site work included mobilization, site grading and temporary erosion control ad drainage, underground utilities, utility tunnel, perimeter foundation and under slab drainage, architectural precast wall panels, elevators, below-grade waterproofing insulation, and...