by Flame Vo | Oct 25, 2022
Performance Construction Company was hired to construct a new spillway, control tower bulkhead, and cast-in-place box culvert and outlet structure. The project included: Class C Concrete Backfill – Placement of approximately 460 CY of PennDOT Class C concrete...
by Flame Vo | Oct 25, 2022
The Lofty Reservoir Rehabilitation Project originally consisted of the removal of a portion of the top of the dam crest and installation of a concrete retaining wall for the full length of the crest to allow for a higher level of safety curing a probable maximum flood...
by Megan McDowell | Oct 25, 2022
J. Vinton Schafer Construction, LLC completed the Dundalk High School Addition for Baltimore County Public Schools in August 2026. The project addressed significant overcrowding at the shared Dundalk High School/Sollers Point Technical High School campus, which had...
by Flame Vo | Oct 25, 2022
The Schuylkill River Trail Bridge project consisted of construction of a new 115’ span concrete adjacent box beam on new concrete abutments. This section of the Schuylkill River Trail previously crossed SR-724 at a busy intersection that also featured a blind turn....
by Flame Vo | Oct 25, 2022
Performance Construction Company was awarded a project working with Loyalsock Township to improve and restore stream banks. Stream diverting coffer dams were used during the construction of two pedestrian bridges in Loyalsock’s Recreational Parks along Millers...